What you need to know.
The typical planning sequence includes the initial brief, measurement, configuration drawings, specification approval, fabrication coordination and site installation. The actual sequence and lead time depend on the agreed work and site readiness. Clarify who removes old frames and repairs the wall.
How to choose for your home.
Before handover, operate every window panel, inspect locks and review the visible joints with the team. Keep drawings, invoices and written care and warranty instructions together.
Your practical checklist.
- Approve dimensions and drawings.
- Clarify site readiness.
- Define civil-work responsibilities.
- Complete an final check of every window and door.
What to share with our team.
Send a photo of the window or door opening and the room around it. Write the approximate width and height in feet, inches or millimetres, and clearly mention the unit. Tell us what matters most: fresh air, privacy, mosquito mesh, easy cleaning or space saving.
The team will confirm the final size, suitable materials, price and installation work. If your project needs an engineer’s approval or special safety requirements, discuss these before placing the order.
Discuss your project with iTech